SAA ACCREDITED INSTALLERS

Solar panel
installation

What happens from your first quote to switching on: the design, approvals, install day and the standards we work to.

Solar panel
1–2 days
Typical home install
SAA
Accredited installers
15+ yrs
In the solar market
NETCC Approved SellerSAA accredited installersAustralian owned
BOOK A FREE SITE CHECK
$0 upfront
Interest-free loan options for eligible customers, subject to approval. Get your tailored quote below.

We use your details only to prepare your quote, as set out in our Privacy Policy.

Step by step

How solar installation works

  1. 01

    Free quote and roof check

    We look at your bills, roof direction, shading and switchboard, then send a written quote with the STC discount shown.

  2. 02

    System design

    We design the panel layout and size the inverter. If the installer finds a better layout on the day, they may adjust it for the best result.

  3. 03

    Network application

    We apply to your network to connect, such as Western Power in Perth or Ausgrid, Endeavour Energy or Essential Energy in NSW.

  4. 04

    Install day

    Rails and roof feet go on, then the panels, isolators and inverter. Most home installs take a day or two.

  5. 05

    Testing and switch-on

    We test and commission the system, set up monitoring and show you how it works.

  6. 06

    Meter and paperwork

    Your retailer updates your meter if needed, and you receive your compliance certificate and warranty documents.

Standards

Built to Australian standards

AS/NZS 5033

The standard for installing solar panel arrays safely, including wiring and isolation.

AS/NZS 4777.1

Covers how inverters connect to the grid, including export and safety settings.

AS/NZS 3000

The wiring rules that apply to all electrical work in your home.

Roof and wind loads

Rails and roof feet are fixed to suit your roof type and local wind conditions.

Your roof

Roofs we install on

  • Concrete and terracotta tile roofs
  • Metal roofs such as Colorbond, corrugated and Klip-Lok
  • Flat roofs, using tilt frames where needed
  • Single-storey and double-storey homes

Thinking about a battery?

A hybrid inverter installed now makes adding a battery later simple. Many customers install both together to get the battery rebate.

Solar battery installation guide
In depth

Solar installation: what to expect

Before the install

Every installation starts with a quote and a roof assessment. We look at your power bills, roof direction and pitch, shading, roof material and switchboard. From that, we design the panel layout and choose an inverter that suits your usage and your network's rules. If the installer finds a better or safer layout on the day, they can adjust it to get the best possible result.

We then apply to your network to connect the system. In Perth that is Western Power, and in NSW it is Ausgrid, Endeavour Energy or Essential Energy depending on your area. Your network sets how much your system can export to the grid.

On installation day

Most home installs are finished within a day or two. The team installs rails and roof feet suited to your roof type, mounts the panels, runs cabling in conduit, fits isolators and installs the inverter, usually on a shaded wall near the switchboard. There is a short planned power shutdown while the inverter is connected to your switchboard.

Before we leave, the system is tested and commissioned, monitoring is set up on your phone, and we show you how to read the inverter and the app.

Standards and safety

Solar installations in Australia must meet AS/NZS 5033 for the solar array, AS/NZS 4777.1 for connecting inverters to the grid and AS/NZS 3000, the wiring rules. Installation must be done by a licensed electrician, and to receive the STC discount the designer and installer must be SAA accredited. After the install you receive your state's electrical compliance certificate.

After the install

Your retailer may need to update your meter so it can measure exported power. This can take a few weeks after installation, depending on your retailer and network. Once it is done, your feed-in credits appear on your bill. Keep your compliance certificate and warranty documents in a safe place, and plan a professional service every couple of years.

Roof types and tricky jobs

We install on tile, metal and flat roofs, on single and double-storey homes. Flat roofs may need tilt frames, and older or fragile tile roofs may need extra care or replacement tiles. If your roof has shading from trees or nearby buildings, we design around it and may recommend panels or inverters that cope better with partial shade.

Recent installations

Real installs.
Across WA and NSW.

Every system is designed, installed and signed off by our own accredited team. Here are some of the latest.

  • 15+ yrsIn the solar market
  • WA · NSWHomes and businesses
  • SAAAccredited installers
  • NETCCApproved Seller
Happy Solar Red customer next to his new Fox ESS inverter and battery
Happy customer
Fox ESS hybrid inverter and battery with safety bollard, Perth Hills WA
Fox ESS · Perth Hills WA
Aerial view of an aged care facility with 400 solar panels in NSW
Aged care · NSW
Growatt battery stack, Albany WA
Growatt · Albany WA
Solar panels on a metal roof in the Perth Hills, WA
Solar · Perth Hills WA
Growatt battery stack installed in a garage, Perth WA
Growatt · Perth WA
Solar Red installer fitting panels on a farm roof, Great Southern WA
Great Southern WA
Growatt inverter and battery with safety bollard, Perth WA
Growatt · Perth WA
Growatt battery stack, South West WA
Growatt · South West WA
Fox ESS inverter and battery with safety bollard in a garage, Perth WA
Fox ESS · Perth WA
Solar panels on a metal roof, Tamworth NSW
Tamworth NSW
Fox ESS inverter and battery with safety bollards, Peel WA
Fox ESS · Peel WA
Tall Fox ESS modular battery stack
Fox ESS battery
Fox ESS inverter and battery installed on a weatherboard wall, Perth Hills WA
Fox ESS · Perth Hills WA
Growatt battery with safety bollard, Perth WA
Growatt · Perth WA
Fox ESS inverter and battery in a garage, Great Southern WA
Fox ESS · Great Southern
Growatt battery stack on a brick wall
Growatt battery
Black solar panels on a metal roof, Great Southern WA
Solar · Great Southern
Fox ESS inverter and battery in a carport, Perth WA
Fox ESS · Perth WA
Growatt battery stack on a brick wall, Great Southern WA
Growatt · Great Southern
Fox ESS inverter and battery on a white brick wall
Fox ESS hybrid
Two Growatt battery stacks, Perth WA
Growatt · Perth WA
Your place could be next.Free quote, your price after rebates, no obligation.
Questions

Common questions

How long does a solar installation take?

Most home installs are completed within a day or two. Larger or more complex systems can take longer.

Do I need to be home?

Someone needs to give the installers access at the start and be there for the handover at the end, where we show you how the system works.

Will my power be off?

Only for a short time while the inverter is connected to your switchboard. We let you know beforehand.

Can the panel layout change on the day?

Yes. If the installer finds a better or safer layout on site, they can adjust it to get the best possible result.

What paperwork will I get?

Your state electrical compliance certificate, panel and inverter warranty documents, and your system details.

Do I need council approval for solar?

Most standard rooftop systems on houses don't need council approval, but heritage areas and some strata properties have extra rules. We check before quoting.

Can solar be installed on a rental?

Yes, with the owner's written consent.

How long before I start saving?

From the day your system is switched on. Feed-in credits start once your meter is updated.

Book your solar installation

Free, no-obligation quote. Solar Red is an Approved Seller under the New Energy Tech Consumer Code (download the Code).

Get a free quote1800 449 733
Call 1800 449 733Free quote
Google reviews