What happens from your first quote to switching on: the design, approvals, install day and the standards we work to.



We look at your bills, roof direction, shading and switchboard, then send a written quote with the STC discount shown.
We design the panel layout and size the inverter. If the installer finds a better layout on the day, they may adjust it for the best result.
We apply to your network to connect, such as Western Power in Perth or Ausgrid, Endeavour Energy or Essential Energy in NSW.
Rails and roof feet go on, then the panels, isolators and inverter. Most home installs take a day or two.
We test and commission the system, set up monitoring and show you how it works.
Your retailer updates your meter if needed, and you receive your compliance certificate and warranty documents.
The standard for installing solar panel arrays safely, including wiring and isolation.
Covers how inverters connect to the grid, including export and safety settings.
The wiring rules that apply to all electrical work in your home.
Rails and roof feet are fixed to suit your roof type and local wind conditions.
A hybrid inverter installed now makes adding a battery later simple. Many customers install both together to get the battery rebate.
Solar battery installation guideEvery installation starts with a quote and a roof assessment. We look at your power bills, roof direction and pitch, shading, roof material and switchboard. From that, we design the panel layout and choose an inverter that suits your usage and your network's rules. If the installer finds a better or safer layout on the day, they can adjust it to get the best possible result.
We then apply to your network to connect the system. In Perth that is Western Power, and in NSW it is Ausgrid, Endeavour Energy or Essential Energy depending on your area. Your network sets how much your system can export to the grid.
Most home installs are finished within a day or two. The team installs rails and roof feet suited to your roof type, mounts the panels, runs cabling in conduit, fits isolators and installs the inverter, usually on a shaded wall near the switchboard. There is a short planned power shutdown while the inverter is connected to your switchboard.
Before we leave, the system is tested and commissioned, monitoring is set up on your phone, and we show you how to read the inverter and the app.
Solar installations in Australia must meet AS/NZS 5033 for the solar array, AS/NZS 4777.1 for connecting inverters to the grid and AS/NZS 3000, the wiring rules. Installation must be done by a licensed electrician, and to receive the STC discount the designer and installer must be SAA accredited. After the install you receive your state's electrical compliance certificate.
Your retailer may need to update your meter so it can measure exported power. This can take a few weeks after installation, depending on your retailer and network. Once it is done, your feed-in credits appear on your bill. Keep your compliance certificate and warranty documents in a safe place, and plan a professional service every couple of years.
We install on tile, metal and flat roofs, on single and double-storey homes. Flat roofs may need tilt frames, and older or fragile tile roofs may need extra care or replacement tiles. If your roof has shading from trees or nearby buildings, we design around it and may recommend panels or inverters that cope better with partial shade.
Every system is designed, installed and signed off by our own accredited team. Here are some of the latest.






















Short clips from real jobs, from family homes to working businesses. Tap any video to watch.
Most home installs are completed within a day or two. Larger or more complex systems can take longer.
Someone needs to give the installers access at the start and be there for the handover at the end, where we show you how the system works.
Only for a short time while the inverter is connected to your switchboard. We let you know beforehand.
Yes. If the installer finds a better or safer layout on site, they can adjust it to get the best possible result.
Your state electrical compliance certificate, panel and inverter warranty documents, and your system details.
Most standard rooftop systems on houses don't need council approval, but heritage areas and some strata properties have extra rules. We check before quoting.
Yes, with the owner's written consent.
From the day your system is switched on. Feed-in credits start once your meter is updated.