Lots of Perth homes have solar that went on ten or more years ago. It may still be working, but the inverter is ageing, the system is small by today’s standards, and there is no battery. Before you change anything, there are WA rules to understand, especially if you are still on the old REBS buyback rate.

By the Solar Red team · 8 minute read

Solar panels on a tiled roof

The short answer

  • REBS warning: if you upgrade your system, you may lose REBS and move to DEBS. Check before you change anything.
  • Inverters age first: panels often outlast the original inverter by many years.
  • Bigger is now allowed: since 1 May 2026, homes on the SWIS can install up to 30 kVA of inverter capacity in total.
  • New systems talk to the grid: upgraded systems need communications. If they drop offline, a lower export limit applies.
  • Batteries can be added: with a new hybrid inverter, or a separate battery inverter alongside the old one.
In this guide
  1. First: are you still on REBS?
  2. Your three upgrade options
  3. WA rules that apply to upgrades
  4. Adding a battery to an old system
  5. What we check on an old system
  6. FAQs

First: are you still on REBS?

Older Synergy customers may still be on the Renewable Energy Buyback Scheme (REBS), which pays a flat rate for exported solar. Synergy is clear: if you upgrade your system, you may no longer be eligible for REBS and will need to apply for the Distributed Energy Buyback Scheme (DEBS) instead.

10cDEBS export credit, 3pm–9pm
2cDEBS export credit, all other times

For most people the money is in using their own solar, not exporting it, so moving to DEBS with a battery usually still comes out ahead. But we check what you are on and show you the numbers both ways before you decide.

Your three upgrade options

OptionGood whenWatch out for
Replace the inverterPanels are fine, the inverter has failed or is near the end of its lifePanel voltage must match the new inverter. A hybrid inverter keeps the battery option open
Add panelsYou use more power now, or plan an EV or batteryOld and new panels should not be mixed on the same string. Roof space and mounting condition
Add a batteryYou export a lot in the day and buy power at nightWhether to keep the old inverter or replace it with a hybrid

WA rules that apply to upgrades

30 kVA in totalFrom 1 May 2026, all inverter capacity on site, solar and battery combined, counts towards one 30 kVA limit for a standard connection.
CommunicationsNew and upgraded systems need to stay connected. If they lose communications, they fall back to a lower static export limit.
Gateways for old invertersOlder inverters may need a gateway device to meet the communication requirements. Gateways cover most of the existing inverter market.
ApplicationsAny change to inverter capacity needs Western Power approval and a new Synergy application before the work is done.

Adding a battery to an old system

There are two ways to do it:

Replace with a hybrid inverter: one new inverter runs the panels and the battery. It is tidy and efficient, and it replaces an ageing inverter at the same time.
Keep the old inverter and add an AC battery: the battery brings its own inverter. This makes sense if your solar inverter is fairly new, but it adds to your 30 kVA total and you still have an old unit on the wall.

Homes with existing solar can still get the WA battery rebate, subject to the scheme rules. See our guide to adding a battery to existing solar.

What we check on an old system

Panel health

Cracks, browning, hot spots and the condition of the roof fixings.

Inverter age and faults

Error logs, how much it produces compared with what it should, and whether parts are still available.

Switchboard

Older boards may need upgrading for RCD protection and space for new breakers.

Your buyback scheme

REBS or DEBS, and what changes if you upgrade.

Frequently asked questions

Will I lose REBS if I upgrade my solar?
You may. Synergy says REBS customers who upgrade their system may no longer be eligible and will need to apply for DEBS. We check your situation before any work goes ahead.
Should I replace my old inverter or the whole system?
If the panels are in good condition, replacing just the inverter, ideally with a hybrid that can take a battery, is often the best value. If the panels are damaged or very small, a full upgrade can make more sense.
Can I mix new panels with my old ones?
Not on the same string, because different panels have different electrical characteristics. New panels can usually go on a separate input or a separate inverter.
How big can my system be after an upgrade?
From 1 May 2026, homes on the SWIS can have up to 30 kVA of total inverter capacity on a standard connection, subject to Western Power approval and export limits.
Can I get the WA battery rebate if I already have solar?
Yes. The WA scheme has options for homes with existing solar, as long as the product and setup meet the scheme rules, including VPP participation.

Got an old system?

Send us a photo of your inverter label, your switchboard and your latest Synergy bill. We will tell you what is worth keeping, what is worth replacing, and what it does to your buyback rate.

Call 1800 449 733Get a free quote

Keep reading

Sources: Synergy: upgrading your system, Synergy: DEBS buyback rates, Energy Policy WA: New requirements for solar and batteries, Energy Policy WA: Requirements for solar and batteries, WA Government: Information for applicants. Rules, rates and rebates change; we check them again when we quote.

Call 1800 449 733Free quote
Google reviews