Signing is the easy part. Then the paperwork starts: Synergy, Western Power, rebates, the install, safety notices and your meter. Here is every step in order, who does what, and what you should get at the end.
By the Solar Red team · 8 minute read
The short answer
- Approvals come first: Synergy and Western Power applications are lodged before anything is installed.
- We do the paperwork: applications, rebates, safety notices and the meter request are handled for you.
- You are protected: if network approval cannot be obtained, you get a full refund.
- Install is usually one day: the power is off for a few hours while we work on the switchboard.
- You should leave with: an Electrical Safety Certificate, warranty details and a working app.
In this guide
The steps, in order
You sign, and the cooling-off period starts
If we contacted you first, you have 10 business days to cancel for any reason, with no penalty. No payment is taken and no work starts during that time.
Deposit and final design
A 10% deposit is due once any cooling-off period ends. We send your site design: panel layout, battery location and which circuits are backed up. If it is significantly different from what you agreed to, you can reject it for a full refund.
Rebate and loan applications
If you are eligible for the WA battery rebate or the no-interest loan, that application is made first. Once it is approved, the Synergy and Western Power applications follow.
Synergy application
We lodge a Distributed Energy System application with Synergy. You receive a Retailer Reference Number, and Synergy confirms whether you are on the buyback scheme (DEBS).
Western Power approval
Western Power checks that your street and connection can take the system. Installation only goes ahead once the application is approved.
Install day
Panels, inverter, battery and switchboard work, usually in one day. The power is off for part of it, and we tell you roughly when.
Safety notices and registration
Our electrician lodges the Notice of Completion with Building and Energy, then registers the system with Western Power.
Meter and switch-on
If your meter cannot measure power both ways, it is reconfigured or replaced. Once that is done and the system is registered, it can run fully.
Who does what
Your meter and any metering costs
Solar and batteries need a meter that measures power both into and out of your home. Many Perth homes already have one. If yours does not, Synergy arranges the reconfiguration or replacement with Western Power once the system application goes in. Synergy notes that additional metering costs may apply. If they do and they are not in your quote, we tell you before you sign.
What protects you along the way
Solar Red is a New Energy Tech Consumer Code approved retailer, and these protections are written into our terms and conditions.
What you should have when we leave
Want to know what happens on the day itself? Read how a solar battery is installed in Perth.
Frequently asked questions
- How long from signing to installation?
- It depends on rebate approval, Synergy and Western Power processing, and stock. We give you a target date when you sign and keep you updated at each step. If we miss the target date by more than 4 weeks, you can cancel for a full refund.
- Do I need to contact Synergy or Western Power myself?
- No. We lodge the Synergy application, the Western Power application and the safety notices for you.
- Can I switch my system on as soon as it is installed?
- Your system is commissioned and tested on the day. If your meter needs to be reconfigured to measure power both ways, full export only starts once that is done.
- What happens if Western Power says no?
- Sometimes Western Power approves a smaller export limit, and we redesign around it. If approval cannot be obtained at all, you get a full refund.
- When do I own the system?
- Ownership passes to you once the full balance is paid and the STC paperwork is complete.
Ready to get started?
Tell us your suburb and send a photo of your latest Synergy bill and your switchboard. A local SAA-accredited electrician will look at your home and give you a fixed, itemised quote with every rebate already taken off.
Call 1800 449 733Get a free quoteKeep reading
Comparing options? Our guide to solar batteries in Perth covers sizes, brands and the WA rebate.
Sources: Synergy: Distributed Energy System application, Western Power: Solar and battery connections up to 30 kVA, Western Power: WA battery rebate FAQs, WA Government: Information for applicants, Solar Red terms and conditions. Rules, rates and rebates change; we check them again when we quote.
More guides
Batteries 18 kW solar system in Perth: panels, output and who it suits
18 kW solar system in Perth: number of panels, daily output by season, roof space, WA connection rules, battery pairing…
Batteries 10 kW solar system in Perth: panels, output and who it suits
10 kW solar system in Perth: number of panels, daily output by season, roof space, WA connection rules, battery pairing…
Batteries Perth solar battery guides: every question answered in one place
All Solar Red guides for Perth solar and batteries in one place: rebates, choosing a battery, installation, Synergy plans, safety…
- Rebates taken off your price first
- Interest-free options for eligible homes
- Installed by SAA accredited local electricians
- Grid application and VPP setup handled for you